Skip to main content

BOLL

BOLL Clearcoat VHS 2:1 KIT (Clearcoat 1L + Hardener 0.5L)

Top-grade VHS (VeryHighSolid) clearcoat. Offers excellent scratch resistance and a high gloss finish. Have high solids content (is very efficient). Achieving various textures and replicating OEM factory finishes. Does not require the use of a thinner

Available options

Selected: 1.5L · Clear · Can
£22.98inc. VAT · £19.15 ex. VAT
1

Buy by the carton (trade)

6 units / carton

£124.09 inc. VAT (£103.41 ex. VAT) per carton of 6 · 10% trade discount.

Technical specifications

Drying time
36 h
Application temp.
15°C to 25°C
Packaging
can

Safety & documentation

Hazards

Warning

FlammableHarmful or irritant

This kit holds 2 products, each with its own sheet. Read every one before use. Always verify product specifications and safety information before use.

More about this product

A high-quality VHS (Very High Solid) clear coat offering excellent scratch resistance and a high-gloss finish.

Its high solids content ensures efficient coverage.

The product allows different surface textures to be achieved, helping to reproduce OEM factory finishes.

No thinner is required.

2:1 KIT Clearcoat 1L + Hardener 0.5L

COLOUR

  • Colourless

SUITABLE SURFACES

Can be applied over most commercially available solventborne and waterborne basecoats.

APPLICATION

1. Mix the clear coat with STANDARD hardener in a ratio of 2:1 by volume:

  • Clear coat: 2 parts
  • STANDARD hardener: 1 part

Alternatively, mix by weight:

  • Clear coat: 100 g
  • STANDARD hardener: 52 g

2. No thinner is required.

3. Recommended flow time using a DIN 4 cup at 20°C: 18-22 seconds.

4. Pot life with STANDARD hardener: 1.5 hours at 20°C.

5. Spray-gun settings:

  • Nozzle: 1.2-1.3 mm
  • Pressure: 1.6-2.2 bar

6. Apply 2 coats.

7. Allow 5-10 minutes between coats.

8. Drying and curing times with STANDARD hardener:

At 20°C:

  • Dust-free: 30 minutes
  • Handling hardness: 12 hours
  • Full hardness: 36 hours

At 60°C:

  • Dust-free: 5 minutes
  • Handling hardness: 30 minutes at 60°C, followed by 2 hours at 20°C
  • Full hardness: 30 minutes at 60°C, followed by 24 hours at 20°C

9. When using short-wave infrared drying:

  • Maximum temperature: 90°C
  • Drying time: 10 minutes

PHYSICAL PROPERTIES

Application temperature: +15°C to +25°C

STORAGE

Protect the product from excessively low and high temperatures.

Avoid direct exposure to sunlight and store in a dry place.

Often used with

Similar products from other brands